Fuel hopper instalation at Kaunas cogeneration plant

Challenge

Finding the right place for 500t crane can be challenging when space on site is limited.

Solution

Our experienced team of engineers found the right position to place and assemble the 500t crane so it could perform lifting operations on time and safely.

Crane configuration – 26,5m main boom, 28m luffing jib and 165t of counterweights

Obstacles on site marked in the drawings